Update

Second Airliner in production

08.01.2026

At the turn of the year 2025 / 2026, our skilled production team installed a second Airliner in Hall 4 of our production facility. At the same time, the existing Airliner — on which all Hase Bikes have been manufactured to date — was raised and repositioned.

With this upgrade, we are achieving:

– Optimised workflows

– Improved ergonomics for our employees

– Significantly greater flexibility in production planning

For you as dealers, this means a further reduction in delivery times – one of the most important points of feedback from last year.